We were going to label just the smoke alarms' breaker, but I have a label maker and a slight case of OCD, so Ken let me label everything in the panel, from his new schematic and COMPLETED wiring job for the entire house + garage.
That's a lot of wirin', cowboy! Well done.
Sunday, January 8, 2012
Sunday, January 1, 2012
In hot water now
We are DONE - officially, completely done - with all of the electrical re-wiring in this house. That means the whole house has been 100% re-wired. Nice going, Ken! The cellar is done and wired and all set for the rest of the remodel. We even did fancy (code) stuff like putting the furnace emergency shutoff where it belongs (top of the stairs). We did a little dance when we put the panel cover back on the breaker box - it's been sitting on the floor for literally years, since we've been constantly upgrading the box.
Speaking of the furnace, we've been steadily making improvements to infrastructure that are allowing us to (1) quit using oil, and as a bonus, (2) have redundant systems for everything. Our heat is from a pellet stove, with pellets made in Maine and emissions that are very low. Our insulation, closing the flue, making all the doors and windows actually close, and other basic projects (like storm windows) cut oil usage in half, even before the pellet stove.
As of Friday, we got our hot water off the oil-fired furnace! This means no running the furnace in the summer (which always seemed ridiculous), and massively reduced oil use in winter. We went with a simple, basic - though well-insulated - electric water heater. It was cheap, easy to install, and based on the energy label, should cost about $40/month to run. A big savings over a couple hundred in oil! And, our electric is primarily from hydropower generated from the river we can basically see from a couple of blocks away - nice to be more renewable and much more local in our energy use. We'll see what happens - but again, Ken did a great job installing this and hot showers after a hike today were just perfect.
Up next - more insulating (we started and need to find more discount foam).
Speaking of the furnace, we've been steadily making improvements to infrastructure that are allowing us to (1) quit using oil, and as a bonus, (2) have redundant systems for everything. Our heat is from a pellet stove, with pellets made in Maine and emissions that are very low. Our insulation, closing the flue, making all the doors and windows actually close, and other basic projects (like storm windows) cut oil usage in half, even before the pellet stove.
As of Friday, we got our hot water off the oil-fired furnace! This means no running the furnace in the summer (which always seemed ridiculous), and massively reduced oil use in winter. We went with a simple, basic - though well-insulated - electric water heater. It was cheap, easy to install, and based on the energy label, should cost about $40/month to run. A big savings over a couple hundred in oil! And, our electric is primarily from hydropower generated from the river we can basically see from a couple of blocks away - nice to be more renewable and much more local in our energy use. We'll see what happens - but again, Ken did a great job installing this and hot showers after a hike today were just perfect. Up next - more insulating (we started and need to find more discount foam).
Thursday, December 22, 2011
Tore it up
Finally got a day with:
However, all it looks like is that we ripped the hell out of the place! Especially in the stairway/hall, which involved all closed in old plaster walls, so everything was fishing wire and demolition. Looks worse than when we started, but it will be awesome to have a light in the stairs (it has been treacherous!) and outdoor lights to de-creep the driveway.
More soon - yahoo for vacation time!
- No work
- Puppy at daycare
- Both of us home
- Nowhere to be!
However, all it looks like is that we ripped the hell out of the place! Especially in the stairway/hall, which involved all closed in old plaster walls, so everything was fishing wire and demolition. Looks worse than when we started, but it will be awesome to have a light in the stairs (it has been treacherous!) and outdoor lights to de-creep the driveway.
More soon - yahoo for vacation time!
Sunday, December 4, 2011
Well, hello there!
We've had a hiatus. Not without small jobs getting done - trimming hedges, putting up vent covers, finishing details in the basement (including calling in an expert - the third and hopefully final time we will call for help - to root out the drain in the basement because the new toilet wasn't flushing).
For the past month, we've been totally unable to focus on anything but this guy...
We got a new puppy (7 months, a rescue) named Frankie, and puppies take a lot more time than we remember (it's been a while). He is settling in fantastically and is a great little dog. Today he got pretty worn out with lots of walks and a fundraiser/dog party for the future dog park, so during his nap, we did a few things.
The most awesome thing was installing this new old can opener. We have one of these in the camper - it's a Dazey Senior. After camping with it all summer and then coming in the house to an absolutely horrible new handheld thing that SUCKS, I found another Dazey on ebay and installed it. Super sweet!
Next month - during puppy naps - we will be back in business working on the basement. We have some time over vacation and are looking forward to getting dirty again!

p.s. - the new blogger is taking some getting used to! Nice changes but my photos aren't showing up as cleanly as I'd like. Begging your pardon until I learn...
For the past month, we've been totally unable to focus on anything but this guy...
We got a new puppy (7 months, a rescue) named Frankie, and puppies take a lot more time than we remember (it's been a while). He is settling in fantastically and is a great little dog. Today he got pretty worn out with lots of walks and a fundraiser/dog party for the future dog park, so during his nap, we did a few things.
The most awesome thing was installing this new old can opener. We have one of these in the camper - it's a Dazey Senior. After camping with it all summer and then coming in the house to an absolutely horrible new handheld thing that SUCKS, I found another Dazey on ebay and installed it. Super sweet!Next month - during puppy naps - we will be back in business working on the basement. We have some time over vacation and are looking forward to getting dirty again!

p.s. - the new blogger is taking some getting used to! Nice changes but my photos aren't showing up as cleanly as I'd like. Begging your pardon until I learn...
Sunday, October 2, 2011
Famous Pink Bathroom
I finally saw "The Help" last night - great movie! And the set design was just awesome.
My jaw dropped when I saw Hilly's bathroom - an important part of the plot. (thanks to Vignette Design for posting set photos).
Umm, that's OUR Pepto-pink bathroom, thank you very much! Observe, from our reno photos:
Note: actual Pepto in basket!
My jaw dropped when I saw Hilly's bathroom - an important part of the plot. (thanks to Vignette Design for posting set photos).
Umm, that's OUR Pepto-pink bathroom, thank you very much! Observe, from our reno photos:
Note: actual Pepto in basket!
Thursday, September 22, 2011
Good news...and bad measuring
Good news: we got the fixed glass panel in for the shower. Phew! We picked up a set of 2 Kohler doors at the ReStore for $35, and one of them became this fixed panel. The other one is extra - in case we broke the first, we had a backup! And now we can sell the other one, having not broken the first. (Anyone want to buy a piece of tempered glass?) The wood is our favorite, hinoki (Port Orford Cedar), the stuff we used in the upstairs bath. It's waterproof (the stuff they make Japanese soaking tubs from) and makes it so you can pretty much use any old piece of glass for a shower wall or door.
A shower curtain will close off the front.
Other good news - I got 2 doors installed - one that closes off the back storage room from the bedroom,
and one that closes off the bedroom from the future living room. Need to finish painting that one (thus, the blue tape).
The not so good news - the damn toilet doesn't fit! We are off to get an offset flange tomorrow and we'll see how that goes. Irritating - but we spaced on measuring. Not that we could help it - the flange is in the concrete and we're not moving it!
A shower curtain will close off the front.
Other good news - I got 2 doors installed - one that closes off the back storage room from the bedroom,
and one that closes off the bedroom from the future living room. Need to finish painting that one (thus, the blue tape).
The not so good news - the damn toilet doesn't fit! We are off to get an offset flange tomorrow and we'll see how that goes. Irritating - but we spaced on measuring. Not that we could help it - the flange is in the concrete and we're not moving it!
Friday, September 16, 2011
And we're done.
Well, almost. Well, with the bedroom, anyways.
August was a blur - we were in Canada, then crazy catching-up-at-work-stuff, then my parents' 50th anniversary party which was a big fiesta and required a good bit of planning/coordination/travel time, then we just had a totally cool vintage trailer rally at Acadia.
In between, we've been squeezing in that big ol' punch list, and the bedroom is 99% done which means we call it done! This weekend I will install the door to the back room, thus making the bedroom not have any sort of view of the creepy back room.
We will also install the shower glass wall (managed to order and received the retaining channel from Wilson Glass in the midst of the chaos). And then the toilet, Ken says we'll do that this weekend too, and then the bathroom is like 95% done! At least it will be 100% functional!
Photos:
Corner by the bathroom door. A nice resting spot.
CableTV attachments on the bureau - one of the last punch list items.
Bed was in the upstairs guestroom but is so much better here! Haven't yet put the new quilt on - we're still too messy.
Sneak preview below: some bathroom elements are done, like the sink!

And a silly pic - as I was installing a closet bar, I noticed how the bar end support looks like a goofy little guy. Which reminded me of the movie "My Own Private Idaho" (which was great) - "it looks like a f***ed up face". Love(d) River Phoenix.
August was a blur - we were in Canada, then crazy catching-up-at-work-stuff, then my parents' 50th anniversary party which was a big fiesta and required a good bit of planning/coordination/travel time, then we just had a totally cool vintage trailer rally at Acadia.
In between, we've been squeezing in that big ol' punch list, and the bedroom is 99% done which means we call it done! This weekend I will install the door to the back room, thus making the bedroom not have any sort of view of the creepy back room.
We will also install the shower glass wall (managed to order and received the retaining channel from Wilson Glass in the midst of the chaos). And then the toilet, Ken says we'll do that this weekend too, and then the bathroom is like 95% done! At least it will be 100% functional!
Photos:
Sneak preview below: some bathroom elements are done, like the sink!
And a silly pic - as I was installing a closet bar, I noticed how the bar end support looks like a goofy little guy. Which reminded me of the movie "My Own Private Idaho" (which was great) - "it looks like a f***ed up face". Love(d) River Phoenix.
Subscribe to:
Posts (Atom)











