Good news: we got the fixed glass panel in for the shower. Phew! We picked up a set of 2 Kohler doors at the ReStore for $35, and one of them became this fixed panel. The other one is extra - in case we broke the first, we had a backup! And now we can sell the other one, having not broken the first. (Anyone want to buy a piece of tempered glass?) The wood is our favorite, hinoki (Port Orford Cedar), the stuff we used in the upstairs bath. It's waterproof (the stuff they make Japanese soaking tubs from) and makes it so you can pretty much use any old piece of glass for a shower wall or door.
A shower curtain will close off the front.
Other good news - I got 2 doors installed - one that closes off the back storage room from the bedroom,
and one that closes off the bedroom from the future living room. Need to finish painting that one (thus, the blue tape).
The not so good news - the damn toilet doesn't fit! We are off to get an offset flange tomorrow and we'll see how that goes. Irritating - but we spaced on measuring. Not that we could help it - the flange is in the concrete and we're not moving it!
Thursday, September 22, 2011
Friday, September 16, 2011
And we're done.
Well, almost. Well, with the bedroom, anyways.
August was a blur - we were in Canada, then crazy catching-up-at-work-stuff, then my parents' 50th anniversary party which was a big fiesta and required a good bit of planning/coordination/travel time, then we just had a totally cool vintage trailer rally at Acadia.
In between, we've been squeezing in that big ol' punch list, and the bedroom is 99% done which means we call it done! This weekend I will install the door to the back room, thus making the bedroom not have any sort of view of the creepy back room.
We will also install the shower glass wall (managed to order and received the retaining channel from Wilson Glass in the midst of the chaos). And then the toilet, Ken says we'll do that this weekend too, and then the bathroom is like 95% done! At least it will be 100% functional!
Photos:
Corner by the bathroom door. A nice resting spot.
CableTV attachments on the bureau - one of the last punch list items.
Bed was in the upstairs guestroom but is so much better here! Haven't yet put the new quilt on - we're still too messy.
Sneak preview below: some bathroom elements are done, like the sink!

And a silly pic - as I was installing a closet bar, I noticed how the bar end support looks like a goofy little guy. Which reminded me of the movie "My Own Private Idaho" (which was great) - "it looks like a f***ed up face". Love(d) River Phoenix.
August was a blur - we were in Canada, then crazy catching-up-at-work-stuff, then my parents' 50th anniversary party which was a big fiesta and required a good bit of planning/coordination/travel time, then we just had a totally cool vintage trailer rally at Acadia.
In between, we've been squeezing in that big ol' punch list, and the bedroom is 99% done which means we call it done! This weekend I will install the door to the back room, thus making the bedroom not have any sort of view of the creepy back room.
We will also install the shower glass wall (managed to order and received the retaining channel from Wilson Glass in the midst of the chaos). And then the toilet, Ken says we'll do that this weekend too, and then the bathroom is like 95% done! At least it will be 100% functional!
Photos:
Sneak preview below: some bathroom elements are done, like the sink!
And a silly pic - as I was installing a closet bar, I noticed how the bar end support looks like a goofy little guy. Which reminded me of the movie "My Own Private Idaho" (which was great) - "it looks like a f***ed up face". Love(d) River Phoenix.
Friday, August 12, 2011
Supersize punch list?
We snuck off for a two-week camping sojourn through eastern Canada just after that last post. Part work, part fun. Well, all fun - it was a great work meeting. We got back raring to go on the basement, and summer is getting away.
First, we picked up our unusual ceiling covering for the bathroom which had arrived while we were away. We were a bit stumped - what could we use that would be moisture resistant, kind of modern/loft-ish, thin (can't lose headroom!), robust as a shower ceiling (they had used pegboard before. Pegboard, that's right!), and easy to install - oh, and inexpensive. Inexpensive is a key - this is a basement, it was basically a dungeon before so we can't really make it worse, and we are doing this with what little pocket cash we can scare up. So, inspired by the thin, narrow-ribbed corrugated metal they use all over places like Boulder as snazzy house siding, we inquired at the big box and Shazaam! They ordered us a bunch of 1" galvanized roofing like this (different brand, I think) to use as the ceiling sheathing. It cost about $70 for all of it, and they cut it to length (I gave measurements to 1/8" and they did OK), which rocks. We were able to make the rest of the cuts we needed - for light fixtures, etc., with my handy Jig saw. We strapped the joists and got the ceiling installed inside a single day!
There was a good bit of hilarity installing the first one - picture a 2 foot piece of sharp metal, about 7 feet long, that we're trying to fit perfectly around all sorts of obstacles in a space exactly as long as the metal. It's not as flexible as we thought, and we banged up the walls a lot on the first one - but they were a snap to repaint, so no harm. I hope it works, but hey, I think it looks cool. The slight reflectivity helps keep a little sense of height, even though it's a low ceiling. I'm not sure this photo is doing it justice, and the vent fan is not covered here. More later.
Definitely better than what was there before, which was a maze of pipes, wires, etc. Blech.
Then Ken was on a rampage to get the washer and dryer installed, which needed to move in before we could do much else. Good thing too - there was a hose malfunction - which took a half day or engineering to sort out - and water went, um, everywhere. We sat and watched the entire first load run to make sure there wasn't a repeat gusher - all good now.
The cabinet above is a leftover from our kitchen - I totally rebuilt the boxes with surplus-store plywood and repainted the doors and frame. The machines don't match - they were second-hand gifts from family and are in pristine condition, so we're keeping them. Ultimately there will be a curtain in front to camouflage them. (On the punch list).
Ken used this handy washing machine wall box thingy to handily make all the attachments. Neat!
Finally, I've just tonight finished sanding and whitewashing the window surround in the bathroom, a job I was avoiding (the plywood was crappy and needed a lot of work - and we should have sanded BEFORE installing - duh!). Done now and it came out better than I anticipated. Oh, and we tiled the windowsills - seemed to be the only sensible thing since they're just above grade, plus the ReStore gave us a box of earthy brown tile for $3!
And so, we are now at the point of what I am calling the Supersize Punch List. It's not all tiny jobs, but most of them are. Other jobs are pretty much ready to go and shouldn't (famous last words) be too much trouble. Cross your fingers for the rest of the plumbing installs.
This weekend I plan to be the Punchy Queen and get a lot of the irritating trim and touch up work done, and maybe we can wrap this thing up by the end of summer.
First, we picked up our unusual ceiling covering for the bathroom which had arrived while we were away. We were a bit stumped - what could we use that would be moisture resistant, kind of modern/loft-ish, thin (can't lose headroom!), robust as a shower ceiling (they had used pegboard before. Pegboard, that's right!), and easy to install - oh, and inexpensive. Inexpensive is a key - this is a basement, it was basically a dungeon before so we can't really make it worse, and we are doing this with what little pocket cash we can scare up. So, inspired by the thin, narrow-ribbed corrugated metal they use all over places like Boulder as snazzy house siding, we inquired at the big box and Shazaam! They ordered us a bunch of 1" galvanized roofing like this (different brand, I think) to use as the ceiling sheathing. It cost about $70 for all of it, and they cut it to length (I gave measurements to 1/8" and they did OK), which rocks. We were able to make the rest of the cuts we needed - for light fixtures, etc., with my handy Jig saw. We strapped the joists and got the ceiling installed inside a single day!
There was a good bit of hilarity installing the first one - picture a 2 foot piece of sharp metal, about 7 feet long, that we're trying to fit perfectly around all sorts of obstacles in a space exactly as long as the metal. It's not as flexible as we thought, and we banged up the walls a lot on the first one - but they were a snap to repaint, so no harm. I hope it works, but hey, I think it looks cool. The slight reflectivity helps keep a little sense of height, even though it's a low ceiling. I'm not sure this photo is doing it justice, and the vent fan is not covered here. More later.
Definitely better than what was there before, which was a maze of pipes, wires, etc. Blech.
Then Ken was on a rampage to get the washer and dryer installed, which needed to move in before we could do much else. Good thing too - there was a hose malfunction - which took a half day or engineering to sort out - and water went, um, everywhere. We sat and watched the entire first load run to make sure there wasn't a repeat gusher - all good now.
The cabinet above is a leftover from our kitchen - I totally rebuilt the boxes with surplus-store plywood and repainted the doors and frame. The machines don't match - they were second-hand gifts from family and are in pristine condition, so we're keeping them. Ultimately there will be a curtain in front to camouflage them. (On the punch list).
Ken used this handy washing machine wall box thingy to handily make all the attachments. Neat!
Finally, I've just tonight finished sanding and whitewashing the window surround in the bathroom, a job I was avoiding (the plywood was crappy and needed a lot of work - and we should have sanded BEFORE installing - duh!). Done now and it came out better than I anticipated. Oh, and we tiled the windowsills - seemed to be the only sensible thing since they're just above grade, plus the ReStore gave us a box of earthy brown tile for $3!
And so, we are now at the point of what I am calling the Supersize Punch List. It's not all tiny jobs, but most of them are. Other jobs are pretty much ready to go and shouldn't (famous last words) be too much trouble. Cross your fingers for the rest of the plumbing installs.
This weekend I plan to be the Punchy Queen and get a lot of the irritating trim and touch up work done, and maybe we can wrap this thing up by the end of summer.
Wednesday, July 27, 2011
Garden success!
Friday, July 22, 2011
Design coming together...
The basement is sort of a modern look, and the furniture is going to be all of my mid-century modern collection. I've always loved mid-century, and we've had my pieces stashed all around the house. Now they're going to come together - soon - in the basement.
One thing I didn't already have was a mid-century dresser, so I began looking around a couple of months ago and found this beauty, from the 60s by Bassett. Love the pulls! It was missing one pull and two knobs. Through an odd stroke of luck, I saw a crapped-out dresser on the side of the road that had perfect replacement knobs, and found two coordinating pulls, so it's now all bejeweled again.

I then stumbled upon a matching (slightly different style, but also Bassett) bedside table at the thrift shop, so viola! Instant Bedroom!
Both have been cleaned up and I'll post after pix when we move everything in...soon...Wait, I already said soon. But soon. Really, we'll get there.
One thing I didn't already have was a mid-century dresser, so I began looking around a couple of months ago and found this beauty, from the 60s by Bassett. Love the pulls! It was missing one pull and two knobs. Through an odd stroke of luck, I saw a crapped-out dresser on the side of the road that had perfect replacement knobs, and found two coordinating pulls, so it's now all bejeweled again.
Sunday, July 17, 2011
Thanks, Mrs. Wheat (wherever you are)
We picked up 5 boxes of octagonal white tiles at the Restore last year, thinking we'd use them in the basement bathroom. They're thick (1/2") and appear handmade. A bunch were broken, but we have just enough for the lower half of the walls.
Each box was carefully marked "Mrs. Wheat's Bath". The image of Mrs. Wheat that immediately popped into my head is a proper little old lady at tea - I think my grandmother knew someone with a name like that - and the "Mrs.", the proper salutation, on each box just seems so perfectly old fashioned. I felt so fancy finally installing it this week.
So I began installing Mrs. Wheat's tile on Friday. After grinding my knee into the floor and thinset a bunch, I was pleased to find these knee pads at a yard sale on Saturday - Saturday's tiling was much more pleasant.
We've been waiting to tile until we got the shower panels in - so we would know where to stop tiling, of course. So, here's the shower, and the beginning of tiling from Friday night.
The shower is a homemade, found objects deal. We found two end walls from a fiberglass shower at the big box store for $17 (for both!). We got a couple of pieces of Hinoki wood - our go-to miracle material - to fill in the edges and make a surface we can screw a glass panel (still to come) and shower curtain rod to. More details once the shower is totally done...
And here's the largest of the three walls that needed tile - I've now got all three walls done, just waiting for the few tiles that need special cuts, etc. We're installing leftover 2x2 off-white tiles from the upstairs bath in the spaces, plus an occasional dark teal accent tile that we specially ordered. Luckily our local tile shop was able to order us a single sheet of them, so it was only $9 for the accents.

Hopefully we'll finish up the rest of the tile shortly - then we can install the toilet and washer-dryer!!! Oh, and more trimwork...it's never-ending, isn't it? Getting so close to functional.
Each box was carefully marked "Mrs. Wheat's Bath". The image of Mrs. Wheat that immediately popped into my head is a proper little old lady at tea - I think my grandmother knew someone with a name like that - and the "Mrs.", the proper salutation, on each box just seems so perfectly old fashioned. I felt so fancy finally installing it this week.
So I began installing Mrs. Wheat's tile on Friday. After grinding my knee into the floor and thinset a bunch, I was pleased to find these knee pads at a yard sale on Saturday - Saturday's tiling was much more pleasant.
We've been waiting to tile until we got the shower panels in - so we would know where to stop tiling, of course. So, here's the shower, and the beginning of tiling from Friday night.The shower is a homemade, found objects deal. We found two end walls from a fiberglass shower at the big box store for $17 (for both!). We got a couple of pieces of Hinoki wood - our go-to miracle material - to fill in the edges and make a surface we can screw a glass panel (still to come) and shower curtain rod to. More details once the shower is totally done...
And here's the largest of the three walls that needed tile - I've now got all three walls done, just waiting for the few tiles that need special cuts, etc. We're installing leftover 2x2 off-white tiles from the upstairs bath in the spaces, plus an occasional dark teal accent tile that we specially ordered. Luckily our local tile shop was able to order us a single sheet of them, so it was only $9 for the accents.
Hopefully we'll finish up the rest of the tile shortly - then we can install the toilet and washer-dryer!!! Oh, and more trimwork...it's never-ending, isn't it? Getting so close to functional.
Saturday, July 9, 2011
You've come a long way, tapey
Remember the creepy taped-up skin quilt door? Well, it's re-done. We just need to add hardware.
We planned to frost the glass since it will be a bathroom door; I wanted to leave a little non-frosted frame around the edge. Luckily they make stuff called artist's tape in all different widths, so I didn't have to painstakingly slice masking tape into thinner strips. This was 1/2" tape.
We originally wanted to use that cool vinyl window stuff that looks like frosted glass, but it's kind of ridiculously priced (and this basement is meant to be super-inexpensive), so we're using the spray paint frosted glass stuff, which I happened to find for only $3 at the overstock store in town. Looks pretty good, we think.
During the past couple of weeks, we've really been cruising on the trim and other major parts of the bedroom in the basement - it's now really close to done! Here's what the door looks like leaned in the jamb:
I'm so behind on the blog, we didn't get to tell you about the flall (that's "floor-wall") yet - we made the bottom half of the walls from laminate flooring in a whitewash, bamboo-esque pattern. It was cheaper and quicker than drywall and we think it will be more durable. It was great to install and we like the look - what do you think? (Yes, we know it's not bungalow - we're going modern in the basement).
And here's a corner of the room - just needing paint on the chair rail and some touch up. Note that Ken has finished all the wiring and lighting in this and in the bathroom - it's awesome to have light and power down there again!
And here's the view from the bathroom into the bedroom. We had a piece of granite left over from the upstairs bath, and it just happened to fit perfectly on the half wall.
Tomorrow we hope to start figuring out how to make a shower stall from a random bunch of glass and shower wall panels we've accumulated. Wish us luck!
We planned to frost the glass since it will be a bathroom door; I wanted to leave a little non-frosted frame around the edge. Luckily they make stuff called artist's tape in all different widths, so I didn't have to painstakingly slice masking tape into thinner strips. This was 1/2" tape.
We originally wanted to use that cool vinyl window stuff that looks like frosted glass, but it's kind of ridiculously priced (and this basement is meant to be super-inexpensive), so we're using the spray paint frosted glass stuff, which I happened to find for only $3 at the overstock store in town. Looks pretty good, we think.
During the past couple of weeks, we've really been cruising on the trim and other major parts of the bedroom in the basement - it's now really close to done! Here's what the door looks like leaned in the jamb:
I'm so behind on the blog, we didn't get to tell you about the flall (that's "floor-wall") yet - we made the bottom half of the walls from laminate flooring in a whitewash, bamboo-esque pattern. It was cheaper and quicker than drywall and we think it will be more durable. It was great to install and we like the look - what do you think? (Yes, we know it's not bungalow - we're going modern in the basement).And here's a corner of the room - just needing paint on the chair rail and some touch up. Note that Ken has finished all the wiring and lighting in this and in the bathroom - it's awesome to have light and power down there again!
And here's the view from the bathroom into the bedroom. We had a piece of granite left over from the upstairs bath, and it just happened to fit perfectly on the half wall.
Tomorrow we hope to start figuring out how to make a shower stall from a random bunch of glass and shower wall panels we've accumulated. Wish us luck!